” An approach that allows all project stakeholders to be brought to the table (unfortunately this is becoming increasingly rare) and to effectively challenge all the components / stages in the construction of the RC cost of a product, with moderation of the stakeholders in virtually real time. “
Raphaël MEILLE – Industrialisation Cost Engineer – THALES
by Philippe Rivoiron | Dec 21, 2019 | Avis clients Design to cost and value EN